Group 1
Improving Logistical Operational Readiness - Allocation of Equipment during Major Planned Events
- SPF
Group 2
Simulation for Resource Management of Specialist Outpatients Clinics (SOCs) with Overbooking
- TTSH
Group 3
Improvement of OT listing and Scheduling System using retrospective data
- SGH

 

Group 4
Optimising SGH Specialist Outpatient Clinics‘ (SOCs) Session Utilisation
- SGH
Group 5
Improving Service Quality & Productivity in Changi General Hospital Medical Social Services
- CGH
Group 6
Feeder Network Optimization
- UPS

 

Group 7
Design a Supply Management System in Dynamic Demand Environment
- IBM
Group 8
Train Captain Duty Redesign for Optimal Manpower Utilization
- SMRT
Group 9
Optimising a Banking Process
- ANZ

 

Group 10
To Establish UPH (Units Per Hour) of Inbound / Outbound Activities for Warehousing Operations
- SCHENKER
Group 11
Design and Enhance Facility's Preventive Maintenance System with the Objective of Minimizing Equipment Down Time
-KEPPELFELS
Group 12
Asset Utilisation Investigation
-WEATHERFORD

 

Group 13
Feasibility of Cable Remanufacturing
- SCHLUMBERGER
Group 14
Feasibility Study of Equipment Buyback Model
-SCHLUMBERGER
Group 15
Failure Diagnostic System
- SCHLUMBERGER

 

Group 16
Influence of Demand Structure to Capacity Commitment
- INFINEON
Group 17
Impact of Cycle Time Variability on Demand Fulfilment Rate
- INFINEON
Group 18
Time-Motion Study for Airport Process
- CAAS

 

Group 19
Improvement of MSA and CPK on in-house Manufacturing Sub-processes for an Electronic Submersible Pump System
- SCHLUMBERGER